What the customer receives

ArchBrief example project brief

This Organization is not an architect and does not design anything. It turns what you want into a brief an architect can quote against, with the constraints listed and the questions that only a professional can answer marked as theirs.

A complete sample document, written the way ArchBrief writes one. The customer, the numbers and the sources are illustrative.

ArchBrief Project brief

Project Brief Builder · USD 49

Rear extension, 41 Coledale Road: the brief for your architect

What you need, what you have said you want, and the gap between the two. Written to be handed over at the first meeting.

Prepared for
Ravi and Jess N. · 1930s semi, three bedrooms
Reference
AB-B-11409
Issued
1 October 2026
Settlement
$BRIEF · USDC on Base

You have a clear idea of what you want and a budget that does not currently buy it. Better to know that in a brief than to find out in a design. The schedule below is what you described; clause 4 is what it costs at the rate your neighbours paid, and clause 5 is what to cut first.

The room list and the budget are about 40 percent apart

What you have described is roughly 42 square metres of new and remodelled space. At the rate two comparable projects on your street settled at, that is around 155,000 GBP before fees, against a budget of 110,000. This is normal at brief stage and it is far cheaper to resolve now than after a design exists.

42 m² New and remodelled
110k GBP, stated budget
~155k GBP, indicative at local rates
7 Questions for the architect
1

Objective

What the project is for

In your words, from the intake: "We want to stop eating in the hallway and we want somewhere the kids can be that isn't the sofa. And we're not moving, so it has to work for ten years, not two."

DriverDetailPriority
Kitchen and dining together Currently separate, kitchen is 7 m² and galley Must have
A second living space For children, homework and noise separation Must have
Utility out of the kitchen Washing machine currently under the worktop Strongly wanted
Downstairs WC None at present Strongly wanted
Better connection to the garden Garden is used twice a year Wanted
Home working space One of you three days a week Wanted
Fourth bedroom Discussed and set aside for now Not in this phase
2

Schedule

Room and space schedule

SpaceNowWantedNote
Kitchen 7 m², galley Part of a 30 m² open space Island wanted, needs 1 m clearance each side
Dining None. Hallway table Seats 6, 8 at a push In the same space as the kitchen
Living, main 16 m², keep 16 m², unchanged Not part of the works
Living, second None 12 m², separate door The contested one, see clause 5
Utility None 3.5 m² Washer, dryer, sink, coats
WC None 1.8 m² Must be off a lobby, not the kitchen
Study Corner of a bedroom Nook, not a room Could sit in the second living space
Storage Under stairs only Bikes, buggy, garden Consistently forgotten

Total new and remodelled area is approximately 42 m². This is your requirement expressed as areas, not a design, and an architect may well meet it in less space than the sum of the parts.

Where the 42 m² goes · m²
Kitchen and dining 30
Second living space 12
Utility 3.5
WC and lobby 2.8
Storage 2

Sums to more than 42 because the kitchen and dining figure includes area you already have. Net new build is approximately 28 m².

3

Adjacency

What has to be next to what

  1. Kitchen and dining: one space, no door. This is the whole project and everything else gives way to it.
  2. Utility: directly off the kitchen, with a door that can be shut on the noise.
  3. WC: reachable from the hall without passing through the kitchen. This rules out several otherwise sensible layouts.
  4. Second living space: a door that closes, and not directly open to the kitchen. The point is noise separation.
  5. Garden access: from the dining end rather than the kitchen end.
  6. Storage: at the back door, where bikes and muddy things actually arrive.
4

Constraints

To be verified by a professional, not by us

ConstraintWhat we foundWho confirms
Conservation area Not in one, per the council map Architect to confirm
Listed No Architect to confirm
Permitted development Possibly, single storey rear Architect or planning consultant
Article 4 direction Unknown. Not shown on the public map Council, in writing
Party wall Both sides. Semi detached plus a boundary Party wall surveyor
Drainage A manhole in the proposed footprint Architect and water authority
Trees Neighbour's sycamore within 6 m Architect, and a tree survey
Structural, removing the rear wall Load bearing, assume a beam Structural engineer
Gas meter position On the rear wall Architect, and the supplier

None of this is a professional opinion. It is what a careful person can see from the deeds, the council's public map, a site visit and a drain cover, gathered so that your architect is not discovering it at their own hourly rate.

5

Budget

The gap, and what to cut first

ElementIndicativeIf cutEffect on the brief
Core: kitchen, dining, structure ~105,000 Cannot cut This is the project
Second living space, 12 m² ~32,000 Defer to phase 2 Biggest single saving. Loses a must have
Utility ~9,000 Keep Small money, high daily value
WC and lobby ~7,000 Keep Hard to add later once walls are set
Rooflights, 3 ~6,000 Reduce to 1 Cosmetic, easy saving
Bifold doors ~8,000 Sliding or French Saves 3,000 to 5,000
Underfloor heating ~4,500 Radiators Saves most of it
Kitchen units and appliances Excluded n/a Not in the 155k. Budget separately

Indicative figures come from two comparable projects on your street completed in 2025 and 2026, supplied by you, adjusted for area. They are a sense of scale for the brief conversation. They are not a quote, an estimate or a cost plan, and nobody has priced your project.

6

Handover

Seven questions for the first meeting

  1. Given the manhole, is the footprint we have described achievable, and what does building over or near it add in time and cost?
  2. Is this permitted development or does it need a full application, and is there an Article 4 direction here?
  3. Can the WC be reached from the hall in a plan that also gives us the open kitchen and dining?
  4. What would you do differently if the second living space were deferred to a later phase?
  5. What is your fee, at what stages, and what is excluded?
  6. Do we need a structural engineer and a party wall surveyor, and do you appoint them or do we?
  7. What is a realistic programme from appointment to starting on site?
  • Take this brief, the deeds and the two neighbour cost figures to the first meeting
  • Ask three architects, and give all three the same brief
  • Do not ask for sketches before appointing. A brief gets you a comparable fee quote; a sketch gets you attached
  • Decide the phase 1 and phase 2 question before design starts, not during it
AB-B-11409 · for your first architect meeting · $BRIEF · 1 October 2026 ArchBrief · $BRIEF
The order behind this document
Format

A written brief with a room schedule, adjacency priorities, a decision log and the list of questions for the architect and the engineer.