What the customer receives

SiteCare example baseline report

This Organization does not sell a report about facilities. What you keep is the baseline: the condition of the site today, the tasks it actually needs, who owns each one, and the ticket process that runs afterwards.

A complete sample confirmation, written the way SiteCare writes one. The customer, the dates and the amounts are illustrative, and nothing here was charged or reserved.

SiteCare Baseline report and service schedule

Site Baseline Visit · from USD 180

Baseline at Bull Ring unit 14, and what the schedule should be

Birmingham. Condition recorded, six issues found, and the one that is the landlord's rather than yours.

Prepared for
Marlowe Coffee · retail unit, 92 m²
Reference
SC-2026-90123
Issued
1 October 2026
Settlement
$SITECARE · USDC on Base

Two hours on site on 29 September. The unit is in reasonable condition and needs less recurring attention than you were quoted. One of the six findings is a landlord repair and you should not be paying for it, which is in clause 03.

Six findings. One is not yours to fix.

Unit 14 is sound. Three findings are routine and go into the recurring schedule, two are minor works we can ticket now, and the sixth is water ingress at the rear service corridor, which is structural and sits with the centre management under your lease. Raise it with them this week rather than absorbing it.

92 m² Retail unit
6 Findings
1 Landlord's, not yours
USD 420 Proposed monthly, not 680

Order record

  • Site Baseline Visit2 hours on site, condition report and schedule USD 195
  • Condition photographs38 images, located and dated Included
  • Proposed task scheduleBy frequency, with time estimates Included
  • Monthly Site CareQuoted below. Not yet contracted Included
  • Minor Works VisitTwo tickets raised, quoted Included
  • Urgent AttendanceFour hour target once contracted Included
TotalUSD 195

Paid in full, 1 October 2026 · USDC on Base

01

Findings

What the baseline found

#FindingOwnerAction
1 Extract filters heavily loaded, behind the machine You Monthly clean. Fire risk if left
2 Floor seal worn through at the counter line You Minor works. Reseal, 2 hours
3 Two ceiling tiles stained, front of house You Minor works. Replace, 30 minutes
4 Bin store door not self closing You Adjust the closer. Pest control point
5 Glazing and frontage, external You Fortnightly in the schedule
6 Water ingress, rear service corridor wall Landlord See clause 03

Finding 1 is the one to act on first. A loaded extract filter above a coffee machine is both a fire risk and the most common reason a food premises inspection goes badly, and it has clearly not been cleaned this year.

02

Schedule

What this unit actually needs

TaskFrequencyTimeWhy
Opening check, photographed Daily, pre-open 15 min Catches overnight issues before customers do
Front of house deep clean Weekly 90 min Beyond the daily staff clean
Extract filter clean Monthly 45 min Finding 1. Non-negotiable
Glazing and frontage Fortnightly 30 min Finding 5
Bin store and external Weekly 20 min Finding 4, and pest prevention
Washroom deep clean Weekly 40 min Routine
Reactive tickets As raised Per ticket Four hour target for contracted sites

This totals about 16 hours a month, which prices at USD 420. The USD 680 a month you were quoted elsewhere assumed a daily deep clean, which a 92 m² unit with a competent opening team does not need. A daily opening check plus a weekly deep clean is the right shape here.

03

Not yours

Finding 6, and why you should not pay for it

StepWhoWhen
Report to centre management, in writing, with photographs You This week
Our photographs and finding, supplied free for that report SiteCare Attached to this document
Landlord investigates the source Centre management Their timescale
Make good inside the unit After the source is fixed, not before Ticket when ready
If they dispute responsibility Your solicitor, reading the lease Not our call

SiteCare is not reading your lease and is not advising you on it. What we can say is what we saw and where the water is coming from, which is the evidence your agent needs and which most facilities companies would simply quote to repaint.

04

How it runs

Tickets, evidence and escalation

  • Every task on the schedule closes with a photograph, timestamped and located
  • Anything found during a routine visit becomes a ticket rather than a verbal mention
  • Tickets carry a priority, an owner and a target, and you see all three
  • Urgent attendance for contracted sites is a four hour target during trading hours
  • Anything requiring a permit, work at height or a specialist goes to a named subcontractor, and you are told who
  • Monthly summary: tasks completed, tickets raised, tickets open, with the photographs
Not within scopeWho
Gas, and anything on the coffee machine's gas or water connection A registered engineer
Electrical beyond lamp changes A registered electrician
Work at height above 2 m Specialist subcontractor with the right access
Anything in the common parts Centre management
Pest treatment A licensed pest contractor. We can coordinate
Lone working after trading hours Not without a site specific assessment
SC-2026-90123 · Aston, Birmingham · $SITECARE · settled in USDC on Base · 1 October 2026 SiteCare · $SITECARE
The order behind this document
Format

A baseline condition report with the findings, a proposed recurring schedule, the landlord boundary and how tickets and evidence work.