SiteFile Handover file

Room Handover Pack · USD 39

Handover pack: kitchen, 14 Ashgrove Terrace

Everything installed in this room, who fitted it, what it is covered by and what has to be done to it. One room, complete.

Prepared for
The owner, 14 Ashgrove Terrace · handover 9 October 2026
Issued
1 October 2026
Settlement
$SFILE · USDC on Base

A handover is usually a carrier bag of manuals and a phone number that stops working. This is the kitchen written down: every appliance with its serial number, every trade with a contact, every warranty with an expiry, and the four things that are still outstanding.

Document control

Document number
SF-ASH-K01
Version
1.0
Effective
9 October 2026
Owner
Homeowner
Approved by
Vellum Build, project manager
Next review
9 October 2027
Classification
Property record. Keep with the deeds
1

Index

Room record

FieldDetail
Room Kitchen and utility, ground floor rear
Works Full strip out, rear wall opened, new kitchen and utility
Contract Vellum Build Ltd, contract dated 3 February 2026
Practical completion 2 October 2026
Defects period 12 months, ends 2 October 2027
Building control Final certificate issued 29 September 2026, ref BC/26/4471
Electrical certificate EIC issued 24 September 2026, ref VE-8812
Gas safety Not applicable. All electric
2

Installed

Appliances and installed products

ItemModelSerialInstalledWarranty ends
Induction hob Bosch PIE631FB1E 902244-117803 18 Aug 2026 18 Aug 2028
Single oven Neff B3ACE4HN0B 441902-008812 18 Aug 2026 18 Aug 2028
Extractor Elica Nikolatesla NT-2026-44119 19 Aug 2026 19 Aug 2028
Integrated fridge freezer Liebherr ICBNe 5123 LB-77420188 20 Aug 2026 20 Aug 2031
Dishwasher Miele G 5350 SCVi MI-2211940 20 Aug 2026 20 Aug 2028
Washing machine, utility Bosch WAU28T64GB BO-4419026 21 Aug 2026 21 Aug 2028
Boiling water tap Quooker Flex PRO3 QK-118-44720 27 Aug 2026 27 Aug 2028
Worktop, 20 mm quartz Silestone Et. Marquina Batch 4471-B 27 Aug 2026 27 Aug 2051
Cabinetry Thornbury, painted oak Order TH-88102 12 Aug 2026 12 Aug 2031
Flooring, engineered oak Havwoods HW3421 Batch 88-114 3 Sep 2026 3 Sep 2051, structural
Underfloor heating mat Warmup DCM-PRO WU-4471902 1 Sep 2026 Lifetime, registered
UFH thermostat Warmup 6iE 6iE-771902 1 Sep 2026 1 Sep 2029

Serial numbers were read off the units at handover, not copied from delivery notes. Photographs of each rating plate are in the digital pack.

3

Warranties

Warranty register and registration status

CoverProviderExpiresRegistered?
Workmanship, all trades Vellum Build 2 October 2028 In contract
Appliances, standard Various, see clause 2 Mostly Aug 2028 Yes, 6 of 7
Quooker, extended Quooker UK 27 August 2028 Yes
Liebherr, 5 year Liebherr 20 August 2031 Yes
Cabinetry Thornbury Kitchens 12 August 2031 Yes
Worktop, 25 year Cosentino 27 August 2051 Yes, cert in pack
Underfloor heating Warmup Lifetime Yes
Electrical installation Vellum Electrical, NICEIC 24 September 2032 Yes, EIC in pack
Washing machine Bosch 21 August 2028 Not registered
4

Trades

Who did what, and who to call

TradeCompanyContactCovered until
Main contractor Vellum Build Ltd Sam Oduya, project manager 2 October 2028
Electrical Vellum Electrical, NICEIC 442190 Via Vellum 24 September 2032
Plumbing Redgate Plumbing Direct, details in pack 2 October 2027
Kitchen fit Thornbury Kitchens, own fitters Installations team 12 August 2031
Worktop template and fit Stonewright Via Thornbury 27 August 2051, material only
Flooring Redgate Flooring Direct 2 October 2027, fit
Plastering and decoration Vellum, in house Via Vellum 2 October 2027
Structural steel and calcs Harlow Structural Engineers Direct Design liability, see contract

During the 12 month defects period, every one of these goes through Vellum Build, not direct. Calling a subcontractor directly for a defect can complicate the claim against the main contract.

5

Maintenance

Maintenance schedule

ItemTaskEveryConsequence if skipped
Extractor Wash the metal filter Month Recirculation efficiency drops, grease reaches the motor
Extractor Replace the charcoal filter 6 months Odour returns. Not covered by warranty
Quooker tap Descale per the manual 6 months, hard water area Warranty can be refused
Dishwasher Clean the filter Month Poor wash, then a callout that is chargeable
Quartz worktop No abrasive or high pH cleaner Always Voids the 25 year cover
Engineered oak Damp mop only, no steam Always Voids the finish warranty
UFH thermostat Check the floor sensor reading Annually Sensor failure is invisible until the floor is cold
Silicone seals Inspect around sink and hob 6 months Water ingress behind the units
Cabinet hinges Adjust and lightly oil 12 months Doors fall out of line, not a defect after 12 months
6

Outstanding

Not complete at handover

ItemStatusOwnerBy
Utility door, catching on the frame Snag, agreed Vellum Build 16 October 2026
Plinth to the right of the dishwasher, not fitted Snag, agreed Thornbury 16 October 2026
Bosch washing machine registration Action for you Homeowner 21 August 2027
As built electrical layout drawing Not yet supplied Vellum Electrical On request

Two snags are logged and agreed in writing with dates. Nothing on this list prevents use of the room. Both snags should be confirmed as closed in writing rather than just observed, because the defects period record depends on it.

  • Keep this file with the deeds. It is the evidence at resale
  • Photograph anything that goes wrong before you report it
  • Report defects in writing to Vellum before 2 October 2027, not after
  • File the digital pack somewhere that is not only on one phone
R

Document control

Revision history

VersionDateAuthorChange
1.01 October 2026SiteFileIssued at handover. Serial numbers verified against the units on 30 September.
0.228 September 2026SiteFileDraft. Washing machine registration found to be outstanding during the warranty check.
0.125 September 2026SiteFileInitial compilation from the contractor's document bundle.
SF-ASH-K01 v1.0 · property record · defects period ends 2 October 2027 · 1 October 2026 SiteFile · $SFILE