Room Handover Pack · USD 39
Handover pack: kitchen, 14 Ashgrove Terrace
Everything installed in this room, who fitted it, what it is covered by and what has to be done to it. One room, complete.
A handover is usually a carrier bag of manuals and a phone number that stops working. This is the kitchen written down: every appliance with its serial number, every trade with a contact, every warranty with an expiry, and the four things that are still outstanding.
Document control
- Document number
- SF-ASH-K01
- Version
- 1.0
- Effective
- 9 October 2026
- Owner
- Homeowner
- Approved by
- Vellum Build, project manager
- Next review
- 9 October 2027
- Classification
- Property record. Keep with the deeds
Index
Room record
| Field | Detail |
|---|---|
| Room | Kitchen and utility, ground floor rear |
| Works | Full strip out, rear wall opened, new kitchen and utility |
| Contract | Vellum Build Ltd, contract dated 3 February 2026 |
| Practical completion | 2 October 2026 |
| Defects period | 12 months, ends 2 October 2027 |
| Building control | Final certificate issued 29 September 2026, ref BC/26/4471 |
| Electrical certificate | EIC issued 24 September 2026, ref VE-8812 |
| Gas safety | Not applicable. All electric |
Installed
Appliances and installed products
| Item | Model | Serial | Installed | Warranty ends |
|---|---|---|---|---|
| Induction hob | Bosch PIE631FB1E | 902244-117803 | 18 Aug 2026 | 18 Aug 2028 |
| Single oven | Neff B3ACE4HN0B | 441902-008812 | 18 Aug 2026 | 18 Aug 2028 |
| Extractor | Elica Nikolatesla | NT-2026-44119 | 19 Aug 2026 | 19 Aug 2028 |
| Integrated fridge freezer | Liebherr ICBNe 5123 | LB-77420188 | 20 Aug 2026 | 20 Aug 2031 |
| Dishwasher | Miele G 5350 SCVi | MI-2211940 | 20 Aug 2026 | 20 Aug 2028 |
| Washing machine, utility | Bosch WAU28T64GB | BO-4419026 | 21 Aug 2026 | 21 Aug 2028 |
| Boiling water tap | Quooker Flex PRO3 | QK-118-44720 | 27 Aug 2026 | 27 Aug 2028 |
| Worktop, 20 mm quartz | Silestone Et. Marquina | Batch 4471-B | 27 Aug 2026 | 27 Aug 2051 |
| Cabinetry | Thornbury, painted oak | Order TH-88102 | 12 Aug 2026 | 12 Aug 2031 |
| Flooring, engineered oak | Havwoods HW3421 | Batch 88-114 | 3 Sep 2026 | 3 Sep 2051, structural |
| Underfloor heating mat | Warmup DCM-PRO | WU-4471902 | 1 Sep 2026 | Lifetime, registered |
| UFH thermostat | Warmup 6iE | 6iE-771902 | 1 Sep 2026 | 1 Sep 2029 |
Serial numbers were read off the units at handover, not copied from delivery notes. Photographs of each rating plate are in the digital pack.
Warranties
Warranty register and registration status
| Cover | Provider | Expires | Registered? |
|---|---|---|---|
| Workmanship, all trades | Vellum Build | 2 October 2028 | In contract |
| Appliances, standard | Various, see clause 2 | Mostly Aug 2028 | Yes, 6 of 7 |
| Quooker, extended | Quooker UK | 27 August 2028 | Yes |
| Liebherr, 5 year | Liebherr | 20 August 2031 | Yes |
| Cabinetry | Thornbury Kitchens | 12 August 2031 | Yes |
| Worktop, 25 year | Cosentino | 27 August 2051 | Yes, cert in pack |
| Underfloor heating | Warmup | Lifetime | Yes |
| Electrical installation | Vellum Electrical, NICEIC | 24 September 2032 | Yes, EIC in pack |
| Washing machine | Bosch | 21 August 2028 | Not registered |
Trades
Who did what, and who to call
| Trade | Company | Contact | Covered until |
|---|---|---|---|
| Main contractor | Vellum Build Ltd | Sam Oduya, project manager | 2 October 2028 |
| Electrical | Vellum Electrical, NICEIC 442190 | Via Vellum | 24 September 2032 |
| Plumbing | Redgate Plumbing | Direct, details in pack | 2 October 2027 |
| Kitchen fit | Thornbury Kitchens, own fitters | Installations team | 12 August 2031 |
| Worktop template and fit | Stonewright | Via Thornbury | 27 August 2051, material only |
| Flooring | Redgate Flooring | Direct | 2 October 2027, fit |
| Plastering and decoration | Vellum, in house | Via Vellum | 2 October 2027 |
| Structural steel and calcs | Harlow Structural Engineers | Direct | Design liability, see contract |
During the 12 month defects period, every one of these goes through Vellum Build, not direct. Calling a subcontractor directly for a defect can complicate the claim against the main contract.
Maintenance
Maintenance schedule
| Item | Task | Every | Consequence if skipped |
|---|---|---|---|
| Extractor | Wash the metal filter | Month | Recirculation efficiency drops, grease reaches the motor |
| Extractor | Replace the charcoal filter | 6 months | Odour returns. Not covered by warranty |
| Quooker tap | Descale per the manual | 6 months, hard water area | Warranty can be refused |
| Dishwasher | Clean the filter | Month | Poor wash, then a callout that is chargeable |
| Quartz worktop | No abrasive or high pH cleaner | Always | Voids the 25 year cover |
| Engineered oak | Damp mop only, no steam | Always | Voids the finish warranty |
| UFH thermostat | Check the floor sensor reading | Annually | Sensor failure is invisible until the floor is cold |
| Silicone seals | Inspect around sink and hob | 6 months | Water ingress behind the units |
| Cabinet hinges | Adjust and lightly oil | 12 months | Doors fall out of line, not a defect after 12 months |
Outstanding
Not complete at handover
| Item | Status | Owner | By |
|---|---|---|---|
| Utility door, catching on the frame | Snag, agreed | Vellum Build | 16 October 2026 |
| Plinth to the right of the dishwasher, not fitted | Snag, agreed | Thornbury | 16 October 2026 |
| Bosch washing machine registration | Action for you | Homeowner | 21 August 2027 |
| As built electrical layout drawing | Not yet supplied | Vellum Electrical | On request |
Two snags are logged and agreed in writing with dates. Nothing on this list prevents use of the room. Both snags should be confirmed as closed in writing rather than just observed, because the defects period record depends on it.
- Keep this file with the deeds. It is the evidence at resale
- Photograph anything that goes wrong before you report it
- Report defects in writing to Vellum before 2 October 2027, not after
- File the digital pack somewhere that is not only on one phone
Document control
Revision history
| Version | Date | Author | Change |
|---|---|---|---|
| 1.0 | 1 October 2026 | SiteFile | Issued at handover. Serial numbers verified against the units on 30 September. |
| 0.2 | 28 September 2026 | SiteFile | Draft. Washing machine registration found to be outstanding during the warranty check. |
| 0.1 | 25 September 2026 | SiteFile | Initial compilation from the contractor's document bundle. |