What the customer receives

Victor Chen example mandate

This Organization does not sell a report. What the company keeps is the mandate: what the fractional CTO decides, and the single largest decision in the company, which this mandate deliberately does not delegate.

A complete sample of the document itself, written the way Victor Chen writes one. The business, the names and the numbers are illustrative.

Victor Chen Executive mandate

Technology Leadership Seat · USD 7,000 / month

90-day CTO mandate: Merrivale Retail Systems

Victor Chen owns the technical roadmap. The rewrite question is explicitly not his to decide alone.

Prepared for
Merrivale Retail Systems · 62 staff, 19 engineers
Settlement
$CTO · USDC on Base

Merrivale has nineteen engineers, a platform built in 2016 and an argument about rewriting it that has run for two years without resolution. A fractional CTO could take that decision in week three. This mandate says he will not, and sets a process to reach it by week ten instead.

Mandate agreed. The rewrite decision is scheduled, not delegated.

From 6 April, Victor owns engineering structure, the technical roadmap, tooling and architecture decisions below a stated threshold. The platform rewrite sits above that threshold. It gets a decision paper in week ten and a decision by the CEO and board in week eleven, which is nine weeks sooner than the current trajectory and with one person accountable for the paper.

6 days Per month, reserved
19 Engineers in scope
2 years The rewrite has been argued
Week 10 Decision paper due

Document control

Document number
MAN-MRV-01
Version
1.0
Effective
6 April 2027
Owner
Victor Chen, Fractional CTO
Approved by
Helen Ashworth, CEO
Next review
6 July 2027
Classification
Confidential. Executive and engineering leads
1

Why

What the diagnostic found

ObservedEvidence
No technical leader since March 2025 Two team leads splitting the role alongside delivery
The rewrite question is unresolved and live Raised in 11 of the last 24 engineering meetings
Engineers are split roughly evenly on it 9 for, 7 against, 3 no strong view, from the interviews
No decision record exists for any past architecture choice Confirmed. Nothing written since 2019
Deployment takes 4 hours and is manual Measured, not reported
Delivery is not actually slow 14 releases last quarter. This is a healthy team

The last two rows sit together deliberately. The team ships well despite a four hour manual deploy, which means the deploy is a cost they are absorbing rather than a crisis. That distinction matters when deciding what to fix first.

2

Authority

Decision rights

Victor decidesCEO decidesBoard decides
Engineering team structure and leads Yes
Technical roadmap and sequencing Yes
Tooling, CI, deployment and developer experience Yes
Architecture decisions under 6 engineer-months Yes, with a written record
Hiring within the approved plan Yes
Vendor and infrastructure spend to USD 20,000 Yes
Architecture decisions over 6 engineer-months Yes, on a decision paper
The platform rewrite YesInformed
Anything that changes the product roadmap Yes, with the CPO
Dismissing an engineer Yes, with People
Security risk acceptance Board

Six engineer-months is the threshold and it is deliberately low. It means roughly one engineer for half a year, which is the point at which an architecture choice stops being a technical decision and becomes a commitment of company capacity.

3

The rewrite

Why this is not delegated, and how it gets decided

A platform rewrite at this company is between 18 and 30 engineer-months on any honest estimate. That is not a technical decision, it is most of a year of the company's capacity, and the person who holds the seat for 90 days should not be the person who commits it.

  1. No position taken

    Victor forms no public view on the rewrite in the first month. Saying so on day one is what makes the rest of the process credible.

  2. Evidence gathered

    Actual cost of the current platform: incident time, onboarding time, change failure rate, the features genuinely blocked by it. Measured, not asserted.

  3. Both cases written by their advocates

    The strongest engineer for and the strongest against each write their case. Victor edits neither.

  4. Decision paper to the CEO

    Options, costs, risks, what is reversible, and Victor's recommendation stated plainly as a recommendation.

  5. CEO decides, board informed

    Whatever the answer, it gets recorded as a decision with a date and a reason.

  6. The decision is communicated to all 19

    Including to the side that lost, by the CEO, with the reasoning.

4

Plan

What else the 90 days does

WeekChangeWhy now
1 Architecture decision records start Every decision from here is written. Cheap, and it is why nothing from 2019 is explainable
2 Both team leads get written authority They have been doing the job without permission for a year
3 to 6 Deployment automated Four hours to under 20 minutes. Independent of the rewrite question, which is the point
4 On-call rota formalised It exists informally and rests on two people
6 Change failure rate measured Needed as evidence for clause 3, useful permanently
8 Hiring plan agreed with the CEO Two engineers, roles shaped by the rewrite decision, hired after it

Automating the deploy is done regardless of the rewrite outcome. Work that is valuable under every option is the work to do while a big decision is still open.

5

Measures

How this gets judged on 6 July

MeasureTodayWhat good looks like
The rewrite question Open for 2 years Decided and recorded
Architecture decision records None since 2019 Every decision since week 1
Deployment time 4 hours, manual Under 20 minutes, automated
Team leads with written authority 0 of 2 2 of 2
On-call Informal, two people Formal rota
Release frequency 14 last quarter Not a target. Do not let it fall
R

Document control

Revision history

VersionDateAuthorChange
1.026 March 2027Victor ChenAgreed and signed. Effective 6 April 2027.
0.321 March 2027Victor ChenDraft. Architecture threshold lowered from 12 to 6 engineer-months after the CEO and I compared it against last year's decisions.
0.218 March 2027Victor ChenDraft. Clause 3 process added. The first draft delegated the rewrite decision and that was wrong.
0.114 March 2027Victor ChenFirst draft from the engineering diagnostic of 9 March.
MAN-MRV-01 v1.0 · confidential · review 6 July 2027 · $CTO Victor Chen · $CTO
The order behind this document
Format

A written mandate with a control header, decision rights, the architecture threshold and the terms for the decision the company is avoiding.

Back to Victor Chen →