What the customer receives

WorkLens example report

The paid deliverable is a structured document the customer keeps, not a chat transcript.

A complete sample document, written the way WorkLens writes one. The customer, the numbers and the sources are illustrative.

WorkLens Capacity health check

Capacity Health Check · USD 59

You do not need a ninth engineer. You need Tuesdays to stop happening.

Six months of jobs, schedules and completion data, against the capacity you actually have.

Prepared for
Calder Field Services · 8 engineers, commercial HVAC
Reference
WL-9962-CHC
Issued
20 October 2026
Settlement
$WORK · USDC on Base

You are about to hire a ninth engineer because the team is overloaded. Across six months the team runs at 74 percent utilisation, which is not overloaded. The problem is that demand arrives in a shape your rota does not match, and three days a week are at 96 percent while two are at 51.

A scheduling problem, priced as a hiring problem

Average utilisation is 74 percent. Monday to Wednesday runs at 96 percent and Thursday to Friday at 51. Levelling the week would release about 1.4 engineers of capacity, which is most of the hire you were about to make.

74% Average utilisation
96% Monday to Wednesday
51% Thursday and Friday
1.4 Engineers of capacity available
01

Shape

Demand against capacity, by day

Average engineer hours demanded against hours scheduled · hours per day
Job hours demandedEngineer hours scheduled
64 0 MonTueWedThuFri Job hours demanded, Mon: 58 Job hours demanded, Tue: 61 Job hours demanded, Wed: 57 Job hours demanded, Thu: 31 Job hours demanded, Fri: 28 28 Engineer hours scheduled, Mon: 60 Engineer hours scheduled, Tue: 60 Engineer hours scheduled, Wed: 60 Engineer hours scheduled, Thu: 60 Engineer hours scheduled, Fri: 60 60

Scheduled capacity is a flat line because the rota is the same every day. Demand is not flat and never has been. The gap on Thursday and Friday is 61 engineer hours a week, which is 1.5 people.

Utilisation by day, six month average
Monday 97% Overtime on 19 of 26 Mondays
Tuesday 102% Over capacity every week
Wednesday 95%
Thursday 52%
Friday 50% Two engineers idle most Fridays
Team average 74%

Tuesday is over 100 percent, which is only possible with overtime. You paid for 340 overtime hours in six months, 71 percent of them on a Monday or Tuesday, while Friday ran at half capacity.

02

Cause

Why the week looks like this

Source of demandShareWhen it arrivesMovable?
Planned maintenance contracts 44% Scheduled by your team Yes, entirely
Reactive callouts 31% Unpredictable No
Follow-up visits 14% Scheduled by your team Yes, entirely
Installations 8% Booked with the customer Mostly
Quotes and surveys 3% Scheduled by your team Yes

Sixty one percent of demand is scheduled by you rather than imposed on you, and almost all of it is currently booked Monday to Wednesday because that is when the office is busiest and it feels natural to book early in the week.

03

Distribution

And it is not even across the team

Utilisation by engineer and day, percent
MonTueWedThuFri
Engineer 1 98%100%97%71%68%
Engineer 2 96%100%94%64%61%
Engineer 3 99%100%98%58%54%
Engineer 4 94%98%91%49%47%
Engineer 5 97%100%96%44%41%
Engineer 6 98%100%99%38%36%
Engineer 7 95%99%92%34%31%
Engineer 8 99%100%98%28%24%
Lower Higher retention

The left three columns are uniformly dark and the right two fade down the list. Engineers 1 to 3 hold their Thursday and Friday work because they are the ones coordinators call first; Engineer 8 is at 24 percent on a Friday. That is a dispatch habit, not a skills difference.

04

Options

What levelling the week is worth

ActionCapacity releasedCostTime to effect
Book planned maintenance Thu and Fri first 0.9 engineers None 4 to 6 weeks
Move follow-up visits to Thu and Fri 0.3 engineers None Immediate
Rotate the dispatch order weekly 0.2 engineers None Immediate
All three together 1.4 engineers None 6 weeks
Hire a ninth engineer 1.0 engineer About USD 64,000 a year 3 months

Three scheduling changes release more capacity than the hire, cost nothing and take six weeks. If demand keeps growing you will still need the ninth engineer, and you will need them from a base of 96 percent utilisation rather than 74.

  1. This week

    Tell both coordinators to offer Thursday and Friday first

    For planned maintenance only. One sentence of instruction, the largest single item in this document.

  2. This week

    Rotate who gets dispatched first

    A weekly rota rather than the same three names. Engineer 8 at 24 percent on a Friday is a dispatch list, not a capability.

  3. Six weeks

    Re-measure before deciding on the hire

    If Thursday and Friday are above 75 percent and Tuesday is under 95, you have your answer and you have saved a year of salary.

  4. Also

    Look at the overtime separately

    Three hundred and forty hours in six months, concentrated on two days. Some of that is unavoidable reactive work and most of it is the shape of the week.

WorkLens capacity analysis · confidential to the buyer · 20 October 2026 WorkLens · $WORK